29 Unbeatable Project Management Techniques And Tools
Welcome to the ultimate guide for project management tools and techniques.
Explore proven techniques, discover time-tracking apps to boost productivity, dive into tools for seamless communication, find the perfect task management apps, and uncover the secrets of successful retrospectives.
Whether you’re a seasoned project manager or just starting, this guide will equip you with the knowledge and tools to conquer any project and deliver outstanding results throughout the project life cycle.
Effortlessly track project timelines and budgets
Optimize project resource allocation with Timeular, the most effortless time tracking solution for Project Management
12 Proven Project Management Techniques:
Gantt
What is it:
A Gantt chart visualizes a project schedule that illustrates the sequence and duration of individual tasks or activities. It provides a clear and concise overview of the project timeline, showing when tasks are scheduled to start and end and how they relate.
How it works:
Gantt charts work by using horizontal bars to represent project tasks or activities. The chart typically consists of a timeline along the horizontal axis and a list of tasks or activities along the vertical axis. Each task is represented by a horizontal bar on the chart, positioned based on its start and end dates.
The length of the bar represents the task’s duration, and the bars’ positioning indicates the task’s order. Dependencies between tasks can be visually represented by linking the bars with arrows.
This allows for understanding task dependencies and identifying the critical path, which is the sequence of tasks that determines the project’s overall duration.
Gantt charts include additional information such as task milestones, progress indicators, and resource allocation.
They provide a visual aid for Project Managers and team members to track progress, identify potential scheduling conflicts, and communicate project timelines effectively. Gantt charts can be created using specialized software tools or spreadsheet applications like Microsoft Excel.
Free eBook: The Project Manager’s Handbook on Time Tracking
Get your step-by-step guide to master time tracking as a Project Manager
Kanban
What is it:
Kanban is a Project Management methodology that visualizes and optimizes workflow to improve efficiency and productivity.
It originated in the manufacturing industry but has been widely adopted in various fields, including software development and Project Management.
How it works:
Kanban works by utilizing a visual board with columns that represent different stages of work. The board is typically divided into columns such as “To Do,” “In Progress,” and “Done.”
Cards or sticky notes represent tasks or work items, moving across the board from one column to another as work progresses.
The fundamental principles of Kanban include limiting work in progress (WIP), focusing on flow, and continuously improving the process.
By setting WIP limits for each column, teams ensure they don’t overload themselves and maintain a smooth and balanced workflow. As work items are completed, new items are pulled into the system to maintain a steady workflow.
Kanban emphasizes visualizing the entire workflow, making bottlenecks and delays visible. It promotes collaboration and encourages teams to identify and address issues promptly.
Continuous improvement is achieved by regularly reviewing the process, analyzing performance metrics, and adjusting to enhance efficiency and quality.
Kanban helps teams manage their work effectively, reduce cycle times, and increase productivity. It provides transparency and flexibility and encourages a focus on delivering value by promoting a culture of continuous improvement.
Risk Management Matrix

What is it:
A Risk Management Matrix, also known as a Risk Probability and Impact Matrix or Risk Assessment Matrix, is a tool used in project risk management to assess and prioritize risks.
It provides a structured approach to identify, analyze, and categorize risks based on their probability of occurrence and potential impact on project objectives.
How it works:
A Risk Management Matrix typically consists of a grid or table with two axes representing risk probability and impact levels.
The probability axis measures the likelihood or chance of a risk event occurring, while the impact axis evaluates the potential consequences or severity of the risk on project objectives.
The probability and impact levels are typically defined on a numerical or qualitative scale, such as low, medium, and high. Risks are assessed and assigned values on both axes, placing them in the corresponding cells of the matrix.
This categorization helps prioritize risks based on their overall risk score, which is calculated by multiplying the probability and impact values.
The matrix allows project teams to visually identify and prioritize high-risk areas by focusing on risks with the highest combined scores. This enables Project Managers to allocate resources, develop risk response strategies, and implement appropriate mitigation measures to address the identified risks.
The Risk Management Matrix is a tool for effective risk communication, decision-making, and monitoring throughout the project lifecycle.
PERT – Program Evaluation and Review Technique
What is it:
PERT (Program Evaluation and Review Technique) is a Project Management method used to analyze and schedule tasks in a project.
It is a probabilistic approach that helps estimate project timelines, identify critical paths, and manage project uncertainties. PERT was initially developed for large-scale projects with high levels of uncertainty, such as complex engineering and construction projects.
How it works:
PERT breaks down a project into individual tasks or activities and analyzes their dependencies and durations. For each task, three-time estimates are used: optimistic (O), most likely (M), and pessimistic (P). These estimates are used to calculate the expected duration for each task using the formula: expected duration = (O + 4M + P) / 6.
Once the expected durations for all tasks are calculated, a network diagram is constructed, illustrating the sequence of tasks and their interdependencies.
The diagram consists of nodes (representing tasks) connected by arrows (representing dependencies). The critical path, the most extended sequence of dependent tasks, is identified based on the expected durations.
PERT also considers the variance or uncertainty associated with each task. The variance is calculated using the formula: variance = ((P – O) / 6)^2.
By summing the variances along the critical path, Project Managers can determine the overall project variance, which provides insights into the project’s potential schedule risk.
PERT helps Project Managers assess the project timeline, identify tasks critical to meeting project deadlines, and allocate resources accordingly. It also provides a quantitative basis for analyzing project risks and allows for effective schedule control and adjustment.
PERT benefits projects with uncertain durations and complex task dependencies, allowing project teams to account for variability and make informed decisions.
Free eBook: The Project Manager’s Handbook on Time Tracking
Get your step-by-step guide to master time tracking as a Project Manager
WBS – Work Breakdown Structure
What is it:
A Work Breakdown Structure (WBS) is a hierarchical decomposition of the project deliverables and work scope into smaller, manageable components. It represents the project’s entire scope of work in a structured format, breaking it down into smaller, more manageable pieces and helping the team to achieve realistic goals.
How it works:
The WBS systematically divides the project scope into smaller work packages or tasks. It follows a top-down approach, starting with the project’s main deliverables and progressively decomposing them into more detailed and specific components.
The WBS is typically presented as a tree-like structure, where the highest-level elements represent the major deliverables or phases of the project.
Each subsequent level further decomposes these elements into sub-deliverables or work packages until a manageable level of work is reached.
The decomposition continues until the tasks or work packages are small enough to be assigned, estimated, and scheduled.
The WBS provides a framework for organizing and understanding the project’s scope, facilitating effective communication, resource allocation, and project planning.
By breaking the project into smaller components, the WBS enables project managers and teams to better define the work required, identify dependencies, estimate resources and durations, and track progress.
It helps ensure all project work is accounted for, reduces ambiguity, and provides a solid foundation for project planning and execution.
Critical Path Method (CPM)

What is it:
The Critical Path Method (CPM) is a project management technique used to identify the longest sequence of dependent tasks, known as the critical path, in a project schedule.
It helps determine the minimum project duration by analyzing the task interdependencies and identifying which tasks are critical to the project’s timeline.
How it works:
CPM analyzes the sequence of project tasks and their dependencies to identify the critical path.
The critical path consists of the tasks that must be completed in a specific order without any delays to prevent project schedule slippage.
To determine the critical path, the following steps are typically followed:
- Identify all project tasks: A comprehensive list of tasks is created to complete the project, including their dependencies and durations.
 
- Define task dependencies: The dependencies between tasks are identified, indicating which tasks must be completed before others can start.
 
- Estimate task durations: The time required to complete each task is estimated, considering factors like resources, effort, and constraints.
 
- Calculate task scheduling: A network diagram or project schedule is constructed, illustrating tasks’ sequence and durations. This allows for visualizing task dependencies and determining the earliest start and finish times for each task.
 
- Determine the critical path: It is identified by finding the most extended sequence of dependent tasks with no flexibility in their start or finish times. Any delay in the critical path tasks will directly impact the project’s overall duration.
 
By understanding the critical path, project managers can focus on the most critical tasks for the project’s success and allocate resources and time accordingly.
CPM helps plan and schedule project activities, manage constraints, and ensure timely completion. It also allows for identifying non-critical tasks that have flexibility and can be delayed without impacting the project’s final delivery date.
Stakeholder Analysis
What is it:
Stakeholder analysis is a systematic approach used in project management to identify, assess, and understand the stakeholders involved in a project.
It involves identifying individuals, groups, or organizations interested in or can be impacted by the project’s outcomes.
The analysis aims to understand stakeholders’ roles, expectations, concerns, influence, and potential impact on the project.
How it works:
Stakeholder analysis typically involves the following steps:
- Identification: Project managers and teams identify and list all potential stakeholders who may be affected by or have an interest in the project. This includes internal stakeholders such as team members, project sponsors, executives, and external stakeholders such as clients, suppliers, regulatory bodies, and the community.
 
- Assessment: Once stakeholders are identified, their characteristics, interests, and potential impact on the project are analyzed. This includes understanding their goals, requirements, expectations, attitudes, and level of influence. Stakeholders are assessed based on factors such as their power, legitimacy, urgency, and proximity to the project.
 
By analyzing stakeholders, project managers can determine their level of influence, support, or potential resistance to the project.
Quality Management
What is it:
Quality management in project management refers to the systematic and coordinated activities and processes employed to ensure that project deliverables meet the required quality standards and customer expectations.
It involves establishing quality objectives, implementing quality control measures, and continuously monitoring and improving the project’s quality throughout its lifecycle.
How it works:
Quality management in project management typically involves the following key elements:
- Quality Planning: Project teams identify quality objectives and requirements, define quality metrics and criteria, and develop a quality management plan. This plan outlines the processes, resources, and activities needed to achieve the desired level of quality.
 
- Quality Control: Quality control activities inspect project deliverables and processes to ensure they meet the established quality standards. It involves conducting inspections, tests, and reviews at various project stages to identify and rectify any quality issues. Quality control also includes monitoring and measuring performance against quality metrics and taking corrective actions when deviations occur.
 
- Continuous Improvement: Quality management emphasizes a culture of continuous improvement. Lessons learned from previous projects, customer feedback, and ongoing monitoring help identify areas for improvement. Project teams use techniques like root cause analysis, process optimization, and quality audits to drive ongoing enhancements to project processes and deliverables.
 
Effective quality management helps in ensuring that project deliverables meet the specified quality requirements, reducing rework and enhancing customer satisfaction.
Change Management
What is it:
Change management in project management refers to the structured approach and set of processes used to prepare, support, and manage organizational and individual transitions resulting from changes in a project.
It helps the project manager perform one of the main responsibilities that involve planning, communicating, and implementing changes to minimize resistance, ensure adoption, and maximize the project’s success.
How it works:
Change management typically involves the following key elements:
- Change Planning: Project teams identify the need for change, assess the impact of the change on stakeholders, and develop a change management plan. The plan outlines the strategy, activities, and resources required to facilitate smooth transitions and mitigate resistance. It includes stakeholder analysis, communication plans, training programs, and change readiness assessments.
 
- Change Implementation: Change management activities are executed to support the implementation of changes. This involves communicating the rationale for change, engaging stakeholders, providing training and support, and addressing concerns or resistance. Effective communication and engagement strategies are employed to ensure stakeholders understand the purpose, benefits, and impact of the change on their roles and responsibilities.
 
Change management also involves monitoring the adoption and effectiveness of the change, gathering feedback, and making adjustments as necessary.
Project teams work closely with stakeholders to address any challenges, provide ongoing support, and reinforce the change to ensure it becomes embedded in the organization’s culture and processes.
By effectively managing change, project managers and teams can increase the likelihood of successful project outcomes, minimize disruptions, and enhance stakeholder satisfaction.
Cost estimation techniques
What is it:
Cost estimation techniques in project management refer to the methods and approaches used to estimate and forecast the financial resources required for completing a project. It involves analyzing project requirements, identifying cost components, and determining the budget.
How it works:
Cost estimation techniques typically involve the following key elements:
- Bottom-up Estimation: This technique involves estimating the cost of individual project tasks or work packages and aggregating them to determine the total project cost.It requires a detailed breakdown of the project scope and considers various cost elements such as labor, materials, equipment, and overhead expenses. Bottom-up estimation provides a more accurate estimate but can be time-consuming and resource-intensive.
 
- Analogous Estimation: Also known as top-down estimation or expert judgment, this technique relies on historical data or expert knowledge to estimate project costs. It involves comparing the current project to similar past projects and using their cost data for estimation. Analogous estimation can provide quick and high-level estimates, but its accuracy may vary depending on the similarity of the projects being compared.
 
Other commonly used cost estimation techniques include:
- Parametric estimation (using statistical models and regression analysis);
 - Three-point estimation (incorporating optimistic, pessimistic, and most likely estimates);
 - Reserve analysis (allocating contingency funds for uncertain or unforeseen costs).
 
Cost estimation techniques rely on accurate and detailed project information, such as the scope, resource requirements, and project constraints.
Project managers and estimation experts use these techniques to provide realistic and reliable cost estimates, which serve as a basis for budgeting, resource allocation, and financial planning.
Project cost tracking
Learn everything about this topic: what is, why it is important and the best ways to track project expenses.
Decision Matrix
What is it:
If you don’t know how to make decisions, this matrix might be perfect for you.
A decision matrix, also known as a decision-making matrix or weighted decision matrix, is a tool used in project management to evaluate and compare different options or alternatives based on multiple criteria.
It provides a systematic and structured approach to decision-making by assigning weights to criteria and scoring options against those criteria.
How it works:
The decision matrix typically involves the following steps:
- Criteria Identification: Project teams identify the criteria that are important for evaluating the options. These criteria can be quantitative (e.g., cost, duration) or qualitative (e.g., quality, risk). The criteria should be relevant to the project and aligned with project objectives.
 
- Weight Assignment: Each criterion is assigned a weight or importance score to reflect its relative importance in the decision-making process. The weights can be determined through discussions, stakeholder input, or other quantitative methods like pairwise comparison.
 
- Option Evaluation: The options or alternatives being considered are evaluated against each criterion and assigned scores or ratings. The evaluation can be done on a numerical scale, such as 1 to 10, or using qualitative descriptions, such as low, medium, and high. The scores reflect the performance or suitability of each option for the specific criterion.
 
- Calculation of Weighted Scores: The scores assigned to each option are multiplied by the corresponding weights assigned to the criteria. The weighted scores for each option are then calculated by summing the products of the scores and weights.
 
- Decision Making: The decision matrix provides a comprehensive view of the options’ performance across the criteria. The option with the highest weighted score is considered the most favorable choice. Project teams can make informed decisions based on the results of the decision matrix, considering both quantitative and qualitative aspects.
 
The decision matrix helps project managers and teams evaluate alternatives objectively, considering multiple criteria and their relative importance.
It brings transparency and structure to decision-making processes, allowing for a systematic evaluation of options.
Free eBook: The Project Manager’s Handbook on Time Tracking
Get your step-by-step guide to master time tracking as a Project Manager
Lessons learned documentation
What is it:
Lessons learned documentation in project management refers to the process of capturing and documenting insights, experiences, and knowledge gained throughout the project lifecycle.
It involves systematically collecting and recording information about what worked well, what didn’t, and the key takeaways from the project. Lessons learned documentation serves as a valuable resource for future projects and helps improve project management practices.
How it works:
The process of lessons learned documentation typically includes the following elements:
- Collection of Information: Project teams collect information about project activities, processes, and outcomes. This can be done through surveys, interviews, workshops, or regular team discussions. Lessons learned can include successes, challenges, risks encountered, unexpected events, and best practices identified during the project.
 
- Documentation and Analysis: The captured information is documented and organized in a structured manner. This can be in the form of written reports, databases, knowledge repositories, or other knowledge management tools. The information is analyzed to identify recurring patterns, root causes of issues, and recommendations for improvement. It is important to ensure confidentiality and anonymity when necessary to encourage open and honest sharing.
 
- Sharing and Application: The lessons learned documentation is shared with relevant stakeholders, such as project team members, management, and future project teams. It can be disseminated through project closeout reports, presentations, or knowledge-sharing platforms. The documented lessons learned serve as a reference for future projects, allowing project teams to avoid repeating mistakes, leverage best practices, and make informed decisions.
 
The lessons learned documentation process is iterative and continuous throughout the project. It encourages a culture of learning, reflection, and improvement.
Why time tracking is vital in project management?
A good project manager needs to understand that time tracking is essential for being successful at his/her job for several reasons:
- Enhances planning and time estimation – By providing historical data, time tracking aids in accurately estimating effort and setting realistic deadlines.
 
- Optimizes resource allocation -Monitoring time allocation enables you to optimize workloads and assign tasks more effectively, ensuring the efficient use of resources.
 - Streamlines budget management – Tracking time spent on activities assists in controlling costs and identifying any inefficiencies that may impact the project’s financials.
 - Simplifies progress tracking – Time tracking offers valuable insights into task progress, allowing for timely adjustments and ensuring projects stay on track.
 
3 Powerful Project Management time tracking apps
Timeular

Timeular is the most appropriate and effortless time tracking tool for Project Management due to its intuitive interface and advanced report capabilities. Project Managers recommend Timeular for multiple reasons:
- It’s easy to use. Timeular’s simplicity and user-friendliness make individual and team time tracking an enjoyable experience. With such ease, there is no need to tirelessly chase after timesheets at the end of the month. They are created automatically, on the go.
 
- The Timeular Tracker helps to build a time tracking habit. It’s a small, 8-sided dice that you can put on your desk to remind you to track your activities. Please note: You can use Timeular software with or without the Tracker.
 
Track your time with a physical Tracker
Build a habit using muscle memory and a powerful physical reminder. All new users get 2 months free subscription when connecting a new Tracker.
- It’s perfect both for teams and individuals. Timeular lets you track time and customize the time entries with notes and tags, which can be shared by the whole team. You can track time together with your team, using shared folders, and create both individual and team reports.
 
- Timeular grows with your team. Create infinite seats to reflect your team composition.
 
- It helps you keep your projects’ budgets and timelines in check. With the budgets feature, you see at a glance the time and budget left for specific projects or clients. You can set alerts to ensure that you won’t overspend.
 
Timeular is a great way to keep track of time! I have reduced the time needed to report my project time which has allowed me to spend more time working on project tasks vs. administration.
Ivan S. Implementation Consultant/ Project Manager
- It automates your time reports. Timeular revolutionizes tracking billable hours and generating transparent time reports for your clients. The app automates these tasks, providing a meticulous breakdown of your activities and ensuring that every single task is accurately tracked and included in your invoice. Additionally, Timeular offers the convenience of exporting your reports to various formats, such as PDF, XLSX, or CSV, allowing for seamless sharing and integration with your invoicing processes.
 
We are much better at accurately tracking our time, which improves client billing
Michele C., Founder at Clementine Healthcare Marketing
- It keeps budgets under control. With Timeular, you can closely monitor project budgets, ensuring a vigilant eye on their progress and profitability. This empowers you to swiftly identify projects at risk of exceeding budgets, enabling you to proactively reallocate your team’s time to where it is most needed. By staying on top of project budgets, Timeular equips you with the insights necessary to make informed decisions and maintain project success.
 
Top Timeular features
- Physical Tracker
 - Quicktrack, which allows starting new time entries with keyboard shortcuts
 - Easy time tracking everywhere you go thanks to a mobile app
 - Automated data visualization and insights
 - Accurate billing with custom reports & data export
 - Adding notes and tags to time entries
 - Shared folders to track time with your team
 - Automated, accurate, and great-looking reports for clients
 - Over 3,000 apps integrated through Zapier
 
Start tracking your team’s time with zero effort
Try Timeular, themost effortless time tracking solution for Porject Managers. Enjoy premium features for 30 days, for free. No credit card required.
Clockify

Clockify is a free time tracking app that allows users to track their time and analyze productivity. It offers features for creating projects, tracking time on tasks, and generating reports.
Clockify provides visual insights into time allocation, billable hours, and project progress. It integrates with other productivity tools and offers browser extensions and mobile apps for convenient time tracking.
Harvest

Harvest is a time tracking app that helps individuals and teams monitor their time and manage projects efficiently. It offers features for tracking time spent on tasks, creating timesheets, and generating reports. Harvest provides insights into project budgets, team productivity, and billable hours.
It integrates with popular project management tools, accounting software and offers desktop and mobile apps for seamless time tracking.
If you already know this tool and it doesn’t fit your needs, read our post and get to know the best Harvest alternatives.
3 Greatest Project Management tools for communication
Slack

Slack is a widely used project management tool for communication and collaboration. It provides a centralized platform for team messaging, file sharing, and integration with various project management and productivity tools.
Slack offers channels for organizing discussions based on topics, direct messaging for one-on-one conversations, and the ability to create private groups. It also supports voice and video calls, screen sharing, and file sharing, making it a comprehensive communication tool for project teams.
Read also: How Slack time tracking increases productivity
Microsoft Teams
Microsoft Teams is a communication and collaboration team app that integrates seamlessly with other Microsoft products and services. It provides team messaging, video conferencing, file sharing, and document collaboration features.
Teams offer dedicated channels for organizing conversations based on projects or topics, direct messaging, and the ability to schedule and join virtual meetings. It also integrates with Microsoft Office apps and allows real-time document collaboration within the platform.
TIP: Increase project profitability by tracking the time spent in Microsoft Teams.
Basecamp
Basecamp is a project management tool that focuses on communication and collaboration. It provides a central hub for teams to share updates, tasks, files, and messages.
Basecamp allows users to create project-specific threads and discussions, assign tasks, set due dates, and share files. It offers a simple and intuitive interface and encourages transparency and accountability in project communication.
Read: Basecamp time tracking in 2 minutes
9 Essential Project Management Apps for Task Management
JIRA
JIRA is a highly customizable and one of the best project management tools primarily used for software development and issue tracking. It provides features for tracking tasks, bugs, and project-related issues.
JIRA’s main strength lies in its flexibility and adaptability to various project methodologies, including Agile and Scrum. It offers extensive customization options, allowing teams to create workflows, define issue types, and configure boards and reports. JIRA also integrates with development tools like Bitbucket and GitHub.
Integrate Timeular with Jira and automatically track time spent on specific tasks
Monday.com
Monday.com is a visual and one of the best resource management software and planning tools that enables teams to plan, track, and collaborate on projects. It offers a flexible and customizable interface where users can create boards to visualize workflows, assign tasks, set deadlines, and track progress.
Monday.com provides multiple views, including Kanban boards, Gantt charts, and timelines, to cater to different project management needs. It also integrates with various third-party applications, allowing seamless data synchronization.
Read also: Monday.com time tracking
Asana
Asana is a web-based project management tool designed to help teams collaborate and organize their work. It provides features for creating and assigning tasks, setting due dates, creating project timelines, and tracking progress.
Asana allows users to visualize project workflows, communicate within tasks, and set priorities. It also integrates with other popular productivity tools and offers a variety of customizable features to adapt to different project management styles.
Integrate Timeular with Asana and automatically track time spent on specific tasks
Zoho Projects
Zoho Projects is a comprehensive project management software that facilitates collaboration, task management, and project tracking. It offers task lists, milestones, Gantt charts, time tracking, and document management.
Zoho Projects supports various project methodologies, including Agile and Waterfall project methodology, allowing teams to customize their workflows accordingly. It integrates with other Zoho applications, such as Zoho CRM and Zoho Docs, to provide a holistic project management experience.
Microsoft Project
Microsoft Project is a popular project management tool primarily focusing on scheduling and planning. It provides features for creating project timelines, assigning resources, tracking progress, and managing budgets.
Microsoft Project offers advanced scheduling capabilities, critical path analysis, and resource management features. It integrates with other Microsoft tools like Excel and SharePoint, allowing seamless data exchange.
Wrike
Wrike is a cloud-based project management tool that enhances team collaboration and project visibility. It offers features for task management, file sharing, Gantt charts, time tracking, and real-time collaboration.
Wrike provides customizable dashboards, workflow automation, and integrations with popular tools like Slack, Google Drive, and Adobe Creative Cloud.
TIP: Improve project management efficiency with this Wrike time tracking integration.
TeamGantt
TeamGantt is an intuitive project management tool focusing on visual project planning and scheduling. It provides features for creating Gantt charts, setting dependencies, assigning tasks, and tracking progress.
TeamGantt allows users to collaborate with team members, share project timelines, and manage resources. It integrates with popular tools like Trello, Asana, and Google Calendar.
GanttPro
GanttPro is an online Gantt chart software that simplifies project planning and scheduling. It allows users to create interactive Gantt charts, set dependencies, and assign tasks.
GanttPro provides features for resource management, progress tracking, and collaboration. It offers various views, including Gantt, board, and timeline, to visualize project data effectively.
Primavera P6
Primavera P6 is a powerful project management tool widely used in the construction, engineering, and energy industries. It focuses on project planning, scheduling, and resource management.
Primavera P6 provides features for critical path analysis, earned value management, and project portfolio management. It is known for its scalability and robust capabilities in handling large and complex projects.
2 Best Project Management tools for Retro
FunRetro
FunRetro is a collaborative, agile retrospective tool that helps teams reflect on their work and identify areas for improvement. It provides a virtual workspace where team members can contribute ideas, vote on suggestions, and track progress.
FunRetro offers various retrospective formats, such as Mad Sad Glad and Start Stop Continue, to facilitate effective team retrospectives.
Parabol
Parabol is an Agile meeting and retrospective tool that enhances team collaboration and communication. It provides features for facilitating stand-ups, retrospectives, and check-ins.
Parabol offers customizable templates, action item tracking, and integrations with popular project management tools like JIRA and Asana.
Conclusion
You’ve reached the end of our comprehensive guide for project management tools and techniques. Armed with knowledge, you are now equipped to tackle any project with confidence.
This guide has provided a complete arsenal for success, from proven project management techniques to time tracking apps, communication tools, task management apps, and retro tools.
Read also
- How to measure profitability of a project
 - 15 Project Management courses
 - Everything about Project management tracking
 - 10 Project Management Certifications
 - How to improve your Project Management skills
 - The best Project Management books to read in 2023
 - The best free online time management training courses